Onshore wind · United Kingdom
Charlton Mires
Operator Redpath Energy Limited
Application Refused1.5 MWData checked 16 November 2026Source record dated 6 October 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Charlton Mires is a 1.5 MW wind farm 7.5 km north of Alnwick, Northumberland, United Kingdom. Its planning application (14/01548/RENE) went to Northumberland on 2 June 2014 and was refused on 14 September 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 5 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Charlton Mires changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Redpath Energy Limited
- Location
- Land East Of South Charlton Village Northumberland, Northumberland, United Kingdom
- Planning authority
- Northumberland
- Planning application
- 14/01548/RENE
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/01548/RENE, with what the planning evidence pack adds for this site.
Every application in Northumberland · Alerts for applications and incidents near here
Timeline
- 2 June 2014 Planning application submitted
- 14 September 2015 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Charlton Mires. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Charlton Mires had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Charlton Mires; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Charlton Mires?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 October 2015.
- Where is Charlton Mires?
- 7.5 km north of Alnwick, Northumberland, United Kingdom.