Onshore wind · United Kingdom

Charlton Mires

Operator Redpath Energy Limited

Application Refused1.5 MWData checked 16 November 2026Source record dated 6 October 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Charlton Mires is a 1.5 MW wind farm 7.5 km north of Alnwick, Northumberland, United Kingdom. Its planning application (14/01548/RENE) went to Northumberland on 2 June 2014 and was refused on 14 September 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 5 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

58 energy sites within 40 km for Charlton Mires

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Redpath Energy Limited
Location
Land East Of South Charlton Village Northumberland, Northumberland, United Kingdom
Planning authority
Northumberland
Planning application
14/01548/RENE
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01548/RENE, with what the planning evidence pack adds for this site.

Every application in Northumberland · Alerts for applications and incidents near here

  • 2 June 2014 Planning application submitted
  • 14 September 2015 Planning permission refused

None found. The register holds no published incident that names Charlton Mires. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Charlton Mires had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Charlton Mires; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Charlton Mires?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 6 October 2015.
Where is Charlton Mires?
7.5 km north of Alnwick, Northumberland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).