Solar · United Kingdom
Wooperton Station, Wooperton - Solar Farm
Operator A&J Scott
Under Construction5.6 MWData checked 16 November 2026Source record dated 5 July 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wooperton Station, Wooperton - Solar Farm is a 5.6 MW solar farm 15 km north-west of Alnwick, Northumberland, United Kingdom. Its planning application (23/00545/RENE) went to Northumberland on 16 February 2023 and was granted on 5 October 2023. Construction started on 1 October 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 2 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Wooperton Station, Wooperton - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wooperton Station, Wooperton - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1499, Solar panels linked to fires at council buildings in Northumberland, 48 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1499 | 2025 | Solar panels linked to fires at council buildings in Northumberland | 48 km | Significant |
| EIR-2721 | 2025 | Solar panel fire breaks out at Shanklea Primary School | 48 km | Significant |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 55 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 5.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- A&J Scott
- Location
- North East Of Wooperton Station Wooperton, Northumberland, NE66 4XW, United Kingdom
- Planning authority
- Northumberland
- Planning application
- 23/00545/RENE
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00545/RENE, with what the planning evidence pack adds for this site.
Every application in Northumberland · Alerts for applications and incidents near here
Timeline
- 1 October 2022 Construction started
- 16 February 2023 Planning application submitted
- 5 October 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Wooperton Station, Wooperton - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Wooperton Station, Wooperton - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wooperton Station, Wooperton - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wooperton Station, Wooperton - Solar Farm?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 July 2022.
- Where is Wooperton Station, Wooperton - Solar Farm?
- 15 km north-west of Alnwick, Northumberland, United Kingdom (postcode NE66 4XW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).