Solar · Brazil
Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project
Operational5 MWChecked 8 October 2026Last changed in the dataset 12 January 2026
Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project is a 5 MW solar farm 42 km west of Barra, Bahia, Brazil. It first operated in 2024. Its status in the Global Energy Monitor solar and wind trackers is operational. No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 5 incidents at solar farms in Brazil, and 359 worldwide.
Get the next one by email
Free alerts on solar PV incidents in Brazil, and an email when Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project is updated. No account needed; unsubscribe in one click.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
By signing up you agree to the privacy policy.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Status
- Operational (Operating)
- Location
- Central, Bahia, Brazil
- First operating
- 2024
- Phases in the tracker
- 5
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project had a fire or other incident?
- None is on the register as of 12 October 2026. The register holds no published incident that names Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project; it holds 5 incidents at solar farms in Brazil.
- What is the status of Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project?
- Operational, in the Global Energy Monitor solar and wind trackers, where it last changed on 12 January 2026.
- Where is Central Fit Associacao de Consumidores de Energia de Geracao Distribuida solar project?
- 42 km west of Barra, Bahia, Brazil.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).