Solar · United Kingdom
Cairnmore Solar Park (extension)
Operator GPV Rhynie
Operational1.2 MWData checked 16 November 2026Source record dated 14 March 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cairnmore Solar Park (extension) is a 1.2 MW solar farm 27 km west of Inverurie, Aberdeenshire, United Kingdom. Its planning application (APP/2015/1303) went to Aberdeenshire on 5 May 2015 and was granted on 23 June 2015. It has been operating since 15 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Cairnmore Solar Park (extension) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.2 MW (this record)
- All phases
- 5 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- GPV Rhynie
- Location
- Cairnmore, Rhynie, Aberdeenshire, AB54 4NA, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2015/1303
- First operating
- 2015
This record is 1.2 MW, one part of a site built in phases. With Cairnmore Solar Park (3.8 MW) the phases on the register add up to 5 MW. Cairnmore Solar Park
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2015/1303, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 5 May 2015 Planning application submitted
- 23 June 2015 Planning permission granted
- 1 July 2015 Construction started
- 15 September 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Cairnmore Solar Park (extension). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Cairnmore Solar Park (extension) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cairnmore Solar Park (extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Cairnmore Solar Park (extension)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2016.
- Where is Cairnmore Solar Park (extension)?
- 27 km west of Inverurie, Aberdeenshire, United Kingdom (postcode AB54 4NA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).