Solar · United Kingdom

Cairnmore Solar Park (extension)

Operator GPV Rhynie

Operational1.2 MWData checked 16 November 2026Source record dated 14 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cairnmore Solar Park (extension) is a 1.2 MW solar farm 27 km west of Inverurie, Aberdeenshire, United Kingdom. Its planning application (APP/2015/1303) went to Aberdeenshire on 5 May 2015 and was granted on 23 June 2015. It has been operating since 15 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 12 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 187 energy sites within 40 km for Cairnmore Solar Park (extension)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
1.2 MW (this record)
All phases
5 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
GPV Rhynie
Location
Cairnmore, Rhynie, Aberdeenshire, AB54 4NA, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2015/1303
First operating
2015

This record is 1.2 MW, one part of a site built in phases. With Cairnmore Solar Park (3.8 MW) the phases on the register add up to 5 MW. Cairnmore Solar Park

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2015/1303, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 5 May 2015 Planning application submitted
  • 23 June 2015 Planning permission granted
  • 1 July 2015 Construction started
  • 15 September 2015 Operational

None found. The register holds no published incident that names Cairnmore Solar Park (extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Cairnmore Solar Park (extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cairnmore Solar Park (extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cairnmore Solar Park (extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2016.
Where is Cairnmore Solar Park (extension)?
27 km west of Inverurie, Aberdeenshire, United Kingdom (postcode AB54 4NA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).