Solar · United Kingdom
Bwlchgwnt Solar Park
Operator YnNi Teg Cyf
Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 11 April 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bwlchgwnt Solar Park is a 0.6 MW solar farm 14 km west of Carmarthen, Dyfed, United Kingdom. Its planning application (PL/03717) went to Carmarthenshire on 25 March 2022 and was granted on 4 July 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 6 other energy sites within 10 km, one of them a solar farm. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bwlchgwnt Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bwlchgwnt Solar Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 128 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1453 | 2026 | Fire crews tackle solar panel unit blaze in Burnham-On-Sea | 128 km | Minor |
| EIR-1551 | 2019 | Fire involving solar panels on a garage roof in Shropshire | 133 km | Minor |
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 138 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- YnNi Teg Cyf
- Location
- Agricultural grazing field adjoining existing community wind turbine south west of Gellywen and south of the Afon Cynin, Dyfed, SA33 6DS, United Kingdom
- Planning authority
- Carmarthenshire
- Planning application
- PL/03717
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PL/03717, with what the planning evidence pack adds for this site.
Every application in Carmarthenshire · Alerts for applications and incidents near here
Timeline
- 25 March 2022 Planning application submitted
- 4 July 2022 Planning permission granted
- 4 July 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Bwlchgwnt Solar Park. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Bwlchgwnt Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bwlchgwnt Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bwlchgwnt Solar Park?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2022.
- Where is Bwlchgwnt Solar Park?
- 14 km west of Carmarthen, Dyfed, United Kingdom (postcode SA33 6DS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).