← Back to Dyfed

Solar · United Kingdom

Redcourt Farm

Operator PS Renewables · Owner Padero Solaer LTD

Operational3.3 MWData checked 16 November 2026Source record dated 18 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Redcourt Farm is a 3.3 MW solar farm 3.5 km west of Carmarthen, Dyfed, United Kingdom. Its planning application (W/30060) went to Carmarthenshire on 1 May 2014 and was granted on 7 October 2014. It has been operating since 30 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 10 other sites and 167 energy sites within 40 km for Redcourt Farm

Members see the sites and incidents around this one, and every record behind them.

PS RENEWABLES LIMITED (08279667), active, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
PS Renewables
Owner
Padero Solaer LTD
Location
Redcourt Farm, Llysonnen Road, Carmarthen, Dyfed, Dyfed, SA33 5DR, United Kingdom
Planning authority
Carmarthenshire
Planning application
W/30060
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for W/30060, with what the planning evidence pack adds for this site.

Every application in Carmarthenshire · Alerts for applications and incidents near here

  • 1 May 2014 Planning application submitted
  • 7 October 2014 Planning permission granted
  • 15 January 2015 Construction started
  • 30 March 2015 Operational

None found. The register holds no published incident that names Redcourt Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Redcourt Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Redcourt Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Redcourt Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 May 2015.
Where is Redcourt Farm?
3.5 km west of Carmarthen, Dyfed, United Kingdom (postcode SA33 5DR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).