Onshore wind · United Kingdom
Cilcrug Farm, Transmawr - Wind Turbine
Operator Constantine Group Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 27 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cilcrug Farm, Transmawr - Wind Turbine is a 0.2 MW wind farm 6.2 km north-west of Carmarthen, United Kingdom. Its planning application (PL/08703) went to Carmarthenshire on 30 December 2024 and was granted on 11 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cilcrug Farm, Transmawr - Wind Turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
CONSTANTINE GROUP LIMITED (00649369), active, since 1960. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cilcrug Farm, Transmawr - Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0874, Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales, 11 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0874 | 2026 | Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales | 11 km | Significant |
| EIR-0790 | 2022 | Nordex attributes a Welsh wind turbine collapse to an overspeed condition | 62 km | Major |
| EIR-0794 | 2022 | Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch | 70 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Constantine Group Limited
- Location
- Cilcrug Farm, Transmawr, Dyfed, Carmarthenshire, SA33 6NA, United Kingdom
- Planning authority
- Carmarthenshire
- Planning application
- PL/08703
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PL/08703, with what the planning evidence pack adds for this site.
Every application in Carmarthenshire · Alerts for applications and incidents near here
Timeline
- 30 December 2024 Planning application submitted
- 11 December 2025 Planning permission granted
- 11 December 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Cilcrug Farm, Transmawr - Wind Turbine. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cilcrug Farm, Transmawr - Wind Turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cilcrug Farm, Transmawr - Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cilcrug Farm, Transmawr - Wind Turbine?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 January 2026.
- Where is Cilcrug Farm, Transmawr - Wind Turbine?
- 6.2 km north-west of Carmarthen, United Kingdom (postcode SA33 6NA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).