Solar · United Kingdom
Burnside Farm, Stanley - Solar Farm
Operator Snaigow Rural Activities Limited
Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 13 June 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Burnside Farm, Stanley - Solar Farm is a 0.3 MW solar farm 7.4 km north-west of Scone, Perth and Kinross, United Kingdom. Its planning application (23/00196/FLL) went to Perth and Kinross on 30 March 2023 and was granted on 1 June 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 9 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Burnside Farm, Stanley - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Burnside Farm, Stanley - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 45 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 45 km | Minor |
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 46 km | Significant |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 125 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Snaigow Rural Activities Limited
- Location
- 95 Metres South Of Burnside Farm Stanley, Perth and Kinross, PH1 4QB, United Kingdom
- Planning authority
- Perth and Kinross
- Planning application
- 23/00196/FLL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/00196/FLL, with what the planning evidence pack adds for this site.
Every application in Perth and Kinross · Alerts for applications and incidents near here
Timeline
- 30 March 2023 Planning application submitted
- 1 June 2023 Planning permission granted
- 1 June 2026 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Burnside Farm, Stanley - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Burnside Farm, Stanley - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Burnside Farm, Stanley - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Burnside Farm, Stanley - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 June 2023.
- Where is Burnside Farm, Stanley - Solar Farm?
- 7.4 km north-west of Scone, Perth and Kinross, United Kingdom (postcode PH1 4QB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).