← Back to Tayside

Solar · United Kingdom

Milton Of Collace, Burrelton - Solar Farm

Operator Solar 2 Limited · Owner Wind 2 Limited

Application Refused49.9 MWData checked 16 November 2026Source record dated 1 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Milton Of Collace, Burrelton - Solar Farm is a 49.9 MW solar farm 9.6 km north-east of Scone, Tayside, United Kingdom. Its planning application (24/00070/FLM) went to Perth and Kinross on 13 March 2024 and was refused on 11 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 18 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 253 energy sites within 40 km for Milton Of Collace, Burrelton - Solar Farm

Members see the sites and incidents around this one, and every record behind them.

SOLAR 2 LIMITED (11913504), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Solar 2 Limited
Owner
Wind 2 Limited
Location
Milton Of Collace, Burrelton, Blairgowrie, Tayside, PH13 9PR, United Kingdom
Planning authority
Perth and Kinross
Planning application
24/00070/FLM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/00070/FLM, with what the planning evidence pack adds for this site.

Every application in Perth and Kinross · Alerts for applications and incidents near here

  • 13 March 2024 Planning application submitted
  • 11 June 2025 Planning permission refused

None found. The register holds no published incident that names Milton Of Collace, Burrelton - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Milton Of Collace, Burrelton - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Milton Of Collace, Burrelton - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Milton Of Collace, Burrelton - Solar Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2025.
Where is Milton Of Collace, Burrelton - Solar Farm?
9.6 km north-east of Scone, Tayside, United Kingdom (postcode PH13 9PR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).