Around this site

← Back to Alberta

Onshore wind · Canada

Bull Trail wind farm

Planned (permitted)270 MWChecked 8 October 2026Last changed in the dataset 11 March 2025

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bull Trail wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Technology
Onshore wind
Capacity
270 MW
Status
Planned (permitted) (Pre-construction)
Owner
EDF Renewables [100%]
Location
Cypress County, Alberta, Canada
First operating
2029

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Bull Trail wind farm. If you know of one, report it (confidential reports are anonymised).

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.