← Back to Alberta
Planning pack for this site, £295Other options

Onshore wind · Canada

Bull Trail wind farm

Owner EDF Renewables [100%]

Planned (permitted)270 MWData checked 8 October 2026Source record dated 11 March 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bull Trail wind farm is a 270 MW wind farm 36 km south-east of Medicine Hat, Cypress County, Alberta, Canada. It first operated in 2029. Its status in the Global Energy Monitor solar and wind trackers is planned (permitted). There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 25 incidents at wind farms in Canada, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bull Trail wind farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 25 comparable onshore wind incidents in Canada, nearest first. The nearest is EIR-0524, Turbine hub and blades detach and fall at Erie Shores Wind Farm, Ontario, 1731 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05242025Turbine hub and blades detach and fall at Erie Shores Wind Farm, Ontario1731 kmMajor
EIR-07182018Wildfire at Ontario wind farm construction site on Henvey Inlet First Nation under investigation2243 kmSignificant
EIR-12172018Wind turbine blade tip breaks in high winds near Tiverton2250 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 22 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
270 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (permitted) (Pre-construction)
Owner
EDF Renewables [100%]
Location
Cypress County, Alberta, Canada
First operating
2029

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Bull Trail wind farm. If you know of one, report it (confidential reports are anonymised).

Has Bull Trail wind farm had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Bull Trail wind farm; it holds 25 incidents at wind farms in Canada.
What is the status of Bull Trail wind farm?
Planned (permitted), in the Global Energy Monitor solar and wind trackers, where it last changed on 11 March 2025.
Where is Bull Trail wind farm?
36 km south-east of Medicine Hat, Cypress County, Alberta, Canada.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).