Around this site

← Back to Alberta

Onshore wind · Canada

Buffalo Atlee wind farm

Operational58 MWChecked 8 October 2026Last changed in the dataset 6 March 2025

Technology
Onshore wind
Capacity
58 MW
Status
Operational (Operating)
Operator
Capstone Infrastructure
Owner
Sawridge First Nation; Capstone Infrastructure Corp
Location
Special Area No. 2, Alberta, Canada
First operating
2023
Phases in the tracker
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

None found. The register holds no published incident that names Buffalo Atlee wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts.