Battery storage · United Kingdom
Broadditch Battery Energy
Operator Harmony Energy · Owner Heit Bd Limited
Operational11 MWData checked 16 November 2026Source record dated 2 February 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Broadditch Battery Energy is a 11 MW battery storage site on the edge of Longfield, Kent, United Kingdom. Its planning application (18/00637/FUL) went to Dartford on 14 May 2018 and was granted on 16 August 2018. It has been operating since 1 March 2023. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 69 other energy sites within 10 km, 22 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Broadditch Battery Energy changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
Outage notices at this site
3 planned or unplanned unavailability notices published under REMIT, 7 Oct 2026 to 8 Oct 2026. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.
Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.
What this site did, from settlement data
Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.
30 settled days to 7 Nov: 350 MWh out and 404 MWh in, active 79% of half hours, peak 6 MW of 11. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.
A day out costs this site about £1,543 at its earnings over the last 31 settled days (wholesale and response and reserve together). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.
Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.
The company behind this site
HARMONY ENERGY LIMITED (10141078), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 11 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Harmony Energy
- Owner
- Heit Bd Limited
- Location
- Land At Broadditch Farm New Barn Road Southfleet, Kent, DA13 9PU, United Kingdom
- Planning authority
- Dartford
- Planning application
- 18/00637/FUL
- First operating
- 2023
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/00637/FUL, with what the planning evidence pack adds for this site.
Every application in Dartford · Alerts for applications and incidents near here
Timeline
- 14 May 2018 Planning application submitted
- 16 August 2018 Planning permission granted
- 1 March 2023 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Broadditch Battery Energy. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Broadditch Battery Energy had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Broadditch Battery Energy; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Broadditch Battery Energy?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2026.
- Where is Broadditch Battery Energy?
- On the edge of Longfield, Kent, United Kingdom (postcode DA13 9PU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).