Battery storage · United Kingdom

Rye Common Lane

Operator Harmony Energy · Owner Pulse Clean Energy SPV Anderson Limited

Revised49.5 MWData checked 16 November 2026Source record dated 14 September 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Rye Common Lane is a 49.5 MW battery storage site 4.7 km south-west of Fleet, Hampshire, United Kingdom. Its planning application (18/01114/FUL) went to Hart on 23 May 2018 and was withdrawn on 30 August 2018. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 40 other energy sites within 10 km, 15 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

HARMONY ENERGY LIMITED (10141078), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Rye Common Lane sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 89 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire89 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction93 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter191 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Harmony Energy
Owner
Pulse Clean Energy SPV Anderson Limited
Location
Blue Bell Lodge, Rye Common Lane, Crondall, Farnham, Surrey, Hampshire, GU10 5DE, United Kingdom
Planning authority
Hart
Planning application
18/01114/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/01114/FUL, with what the planning evidence pack adds for this site.

Every application in Hart · Alerts for applications and incidents near here

  • 23 May 2018 Planning application submitted
  • 30 August 2018 Application withdrawn

None found. The register holds no published incident that names Rye Common Lane. If you know of one, report it (confidential reports are anonymised).

Has Rye Common Lane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Rye Common Lane; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Rye Common Lane?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 14 September 2023.
Where is Rye Common Lane?
4.7 km south-west of Fleet, Hampshire, United Kingdom (postcode GU10 5DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).