Dartford BESS - Battery Energy Storage System

Operator Clearstone Energy

Application Withdrawn300 MWData checked 16 November 2026Source record dated 2 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Dartford BESS - Battery Energy Storage System is a 300 MW battery storage site on the edge of Longfield, Kent, United Kingdom. Its planning application (24/01470/FUL) went to Dartford on 13 January 2025 and was withdrawn on 9 October 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 72 other energy sites within 10 km, 23 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 4 other sites and 693 energy sites within 40 km for Dartford BESS - Battery Energy Storage System

Members see the sites and incidents around this one, and every record behind them.

CLEARSTONE ENERGY LIMITED (10270371), active, since 2016. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
300 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Clearstone Energy
Location
Adjacent Station Road Southfleet, Kent, DA13 9PA, United Kingdom
Planning authority
Dartford
Planning application
24/01470/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/01470/FUL, with what the planning evidence pack adds for this site.

Every application in Dartford · Alerts for applications and incidents near here

  • 13 January 2025 Planning application submitted
  • 9 October 2025 Application withdrawn

None found. The register holds no published incident that names Dartford BESS - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Dartford BESS - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dartford BESS - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dartford BESS - Battery Energy Storage System?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2025.
Where is Dartford BESS - Battery Energy Storage System?
On the edge of Longfield, Kent, United Kingdom (postcode DA13 9PA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).