Battery storage · United Kingdom
Thames Way, Northfleet - Battery Energy Storage
Operator Speedgreen Limited
Awaiting Construction100 MWData checked 16 November 2026Source record dated 3 September 2026
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Thames Way, Northfleet - Battery Energy Storage is a 100 MW battery storage site on the edge of Swanscombe, Kent, United Kingdom. Its planning application (20250730) went to Gravesham on 14 August 2025 and was granted on 20 July 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 73 other energy sites within 10 km, 24 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Thames Way, Northfleet - Battery Energy Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Thames Way, Northfleet - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 7.8 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 7.8 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 159 km | Significant |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 212 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 100 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Speedgreen Limited
- Location
- Thames Way, Northfleet, Gravesend, Kent, DA11 8HN, United Kingdom
- Planning authority
- Gravesham
- Planning application
- 20250730
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20250730, with what the planning evidence pack adds for this site.
Every application in Gravesham · Alerts for applications and incidents near here
Status changed from Application Submitted to Awaiting Construction on 16 November 2026.
Timeline
- 14 August 2025 Planning application submitted
- 20 July 2026 Planning permission granted
- 20 July 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Thames Way, Northfleet - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Thames Way, Northfleet - Battery Energy Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Thames Way, Northfleet - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Thames Way, Northfleet - Battery Energy Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
- Where is Thames Way, Northfleet - Battery Energy Storage?
- On the edge of Swanscombe, Kent, United Kingdom (postcode DA11 8HN).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).