Planning pack for this site, £295Other options

Solar · United Kingdom

Bridlington Waste Water Treatment Works - Solar Array

Operator Yorkshire Water · Owner Kelda Group Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 18 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Bridlington Waste Water Treatment Works - Solar Array is a solar farm on the edge of Bridlington, East Riding of Yorkshire, United Kingdom. Its planning application (23/01362/CLP) went to East Riding of Yorkshire on 12 June 2023 and was granted on 11 August 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

YORKSHIRE WATER LIMITED (03778498), active, since 1999. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bridlington Waste Water Treatment Works - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1175, Rooftop solar panel fire guts NHS mental health ward in Malton, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton38 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster83 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof104 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Yorkshire Water
Owner
Kelda Group Limited
Location
Waste Water Treatment Works, Kingsgate, Bridlington, East Riding of Yorkshire, YO15 3PA, United Kingdom
Planning authority
East Riding of Yorkshire
Planning application
23/01362/CLP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/01362/CLP, with what the planning evidence pack adds for this site.

Every application in East Riding of Yorkshire · Alerts for applications and incidents near here

  • 12 June 2023 Planning application submitted
  • 11 August 2023 Planning permission granted

None found. The register holds no published incident that names Bridlington Waste Water Treatment Works - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Bridlington Waste Water Treatment Works - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bridlington Waste Water Treatment Works - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bridlington Waste Water Treatment Works - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 September 2023.
Where is Bridlington Waste Water Treatment Works - Solar Array?
On the edge of Bridlington, East Riding of Yorkshire, United Kingdom (postcode YO15 3PA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).