Onshore wind · Canada

Brewster Wind Project

Owner Capstone Infrastructure Corp; Wei Wai Kum First Nation

Planned (announced)197 MWData checked 12 November 2026Source record dated 29 July 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brewster Wind Project is a 197 MW wind farm 52 km west of Campbell River, British Columbia, Canada. Its status in the Global Energy Monitor solar and wind trackers is planned (announced). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 25 incidents at wind farms in Canada, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brewster Wind Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 25 comparable onshore wind incidents in Canada, nearest first. The nearest is EIR-0524, Turbine hub and blades detach and fall at Erie Shores Wind Farm, Ontario, 2818 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05242025Turbine hub and blades detach and fall at Erie Shores Wind Farm, Ontario2818 kmMajor
EIR-07182018Wildfire at Ontario wind farm construction site on Henvey Inlet First Nation under investigation3356 kmSignificant
EIR-12172018Wind turbine blade tip breaks in high winds near Tiverton3369 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 22 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
197 MW
Capacity figure from
Global Energy Monitor solar and wind trackers
Status
Planned (announced) (Announced)
Owner
Capstone Infrastructure Corp; Wei Wai Kum First Nation
Location
British Columbia, Canada

View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Brewster Wind Project. If you know of one, report it (confidential reports are anonymised).

Has Brewster Wind Project had a fire or other incident?
None is on the register as of 22 November 2026. The register holds no published incident that names Brewster Wind Project; it holds 25 incidents at wind farms in Canada.
What is the status of Brewster Wind Project?
Planned (announced), in the Global Energy Monitor solar and wind trackers, where it last changed on 29 July 2025.
Where is Brewster Wind Project?
52 km west of Campbell River, British Columbia, Canada.

Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).