Onshore wind · Canada
Brewster Wind Project
Owner Capstone Infrastructure Corp; Wei Wai Kum First Nation
Planned (announced)197 MWData checked 12 November 2026Source record dated 29 July 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Brewster Wind Project is a 197 MW wind farm 52 km west of Campbell River, British Columbia, Canada. Its status in the Global Energy Monitor solar and wind trackers is planned (announced). No other energy site in the register's datasets is within 10 km. The register holds no incident at this site. It holds 25 incidents at wind farms in Canada, and 362 worldwide.
Get an email when Brewster Wind Project changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in Canada. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brewster Wind Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 25 comparable onshore wind incidents in Canada, nearest first. The nearest is EIR-0524, Turbine hub and blades detach and fall at Erie Shores Wind Farm, Ontario, 2818 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0524 | 2025 | Turbine hub and blades detach and fall at Erie Shores Wind Farm, Ontario | 2818 km | Major |
| EIR-0718 | 2018 | Wildfire at Ontario wind farm construction site on Henvey Inlet First Nation under investigation | 3356 km | Significant |
| EIR-1217 | 2018 | Wind turbine blade tip breaks in high winds near Tiverton | 3369 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 22 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 197 MW
- Capacity figure from
- Global Energy Monitor solar and wind trackers
- Status
- Planned (announced) (Announced)
- Owner
- Capstone Infrastructure Corp; Wei Wai Kum First Nation
- Location
- British Columbia, Canada
View on OpenStreetMap (the tracker marks the position as approximate). The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Brewster Wind Project. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Brewster Wind Project had a fire or other incident?
- None is on the register as of 22 November 2026. The register holds no published incident that names Brewster Wind Project; it holds 25 incidents at wind farms in Canada.
- What is the status of Brewster Wind Project?
- Planned (announced), in the Global Energy Monitor solar and wind trackers, where it last changed on 29 July 2025.
- Where is Brewster Wind Project?
- 52 km west of Campbell River, British Columbia, Canada.
Source: Global Energy Monitor, Global Solar Power Tracker and Global Wind Power Tracker, licensed under CC BY 4.0. The dataset. This project on the GEM wiki. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).