Application Refused2.6 MWData checked 16 November 2026Source record dated 1 September 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Braint Wind Farm is a 2.6 MW wind farm 5.8 km north-west of Bangor, Gwynedd, United Kingdom. Its planning application (41C125B/EIA/RE) went to Isle of Anglesey on 14 August 2013 and was refused on 27 July 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 14 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 18 other sites and 57 energy sites within 40 km for Braint Wind Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
2.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
West Coast Energy
Location
On Land At Bryn Eryr Uchaf, Porthaethwy, Menai Bridge, Gwynedd, Gwynedd, LL59 5SA, United Kingdom
Planning authority
Isle of Anglesey
Planning application
41C125B/EIA/RE
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 41C125B/EIA/RE, with what the planning evidence pack adds for this site.

Every application in Isle of Anglesey · Alerts for applications and incidents near here

  • 14 August 2013 Planning application submitted
  • 27 July 2015 Planning permission refused

None found. The register holds no published incident that names Braint Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Braint Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Braint Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Braint Wind Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 September 2016.
Where is Braint Wind Farm?
5.8 km north-west of Bangor, Gwynedd, United Kingdom (postcode LL59 5SA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).