Solar · United States
Blythe Mesa Solar II
Operator IPX Power USA, LLC · Owner Intersect USA, LLC
Operational224 MWData checked 12 November 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Blythe Mesa Solar II is a 224 MW solar farm 8.5 km north-west of Blythe, Riverside County, California, United States. It first operated in 2022. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 17 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States, and 480 worldwide.
Get an email when Blythe Mesa Solar II changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United States. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 224 MW
- Capacity figure from
- U.S. Energy Information Administration, Form EIA-860M
- Status
- Operational
- Operator
- IPX Power USA, LLC
- Owner
- Intersect USA, LLC
- Location
- Riverside County, California, United States
- First operating
- 2022
- Balancing authority
- CISO
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Incidents on the register at this site
None found. The register holds no published incident that names Blythe Mesa Solar II. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Blythe Mesa Solar II had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Blythe Mesa Solar II; it holds 168 incidents at solar farms (hybrid battery and solar sites included) in the United States.
- What is the status of Blythe Mesa Solar II?
- Operational, in the U.S. Energy Information Administration, Form EIA-860M.
- Where is Blythe Mesa Solar II?
- 8.5 km north-west of Blythe, Riverside County, California, United States.
Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).