← Back to California

Battery storage · United States

Blythe Solar III, LLC Hybrid

Operator Blythe Solar III, LLC

Operational115 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blythe Solar III, LLC Hybrid is a 115 MW battery storage site 14 km west of Blythe, Riverside County, California, United States. It first operated in 2021. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 21 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 1 other site and 36 energy sites within 40 km for Blythe Solar III, LLC Hybrid

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (539 MWh)
Capacity
115 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
Blythe Solar III, LLC
Owner
Blythe Solar III, LLC
Location
Riverside County, California, United States
First operating
2021
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Blythe Solar III, LLC Hybrid. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blythe Solar III, LLC Hybrid had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blythe Solar III, LLC Hybrid; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Blythe Solar III, LLC Hybrid?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Blythe Solar III, LLC Hybrid?
14 km west of Blythe, Riverside County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).