← Back to California

Battery storage · United States

Blythe Mesa Solar II

Operator IPX Power USA, LLC · Owner Intersect USA, LLC

Operational112 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Blythe Mesa Solar II is a 112 MW battery storage site 8.5 km north-west of Blythe, Riverside County, California, United States. It first operated in 2022. Its status in the U.S. Energy Information Administration, Form EIA-860M is operational. There are 17 other energy sites within 10 km, 6 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States, and 199 worldwide.

The operator's 23 other sites and 36 energy sites within 40 km for Blythe Mesa Solar II

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (448 MWh)
Capacity
112 MW
Capacity figure from
U.S. Energy Information Administration, Form EIA-860M
Status
Operational
Operator
IPX Power USA, LLC
Owner
Intersect USA, LLC
Location
Riverside County, California, United States
First operating
2022
Balancing authority
CISO

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Blythe Mesa Solar II. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Blythe Mesa Solar II had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blythe Mesa Solar II; it holds 61 incidents at battery storage sites (hybrid battery and solar sites included) in the United States.
What is the status of Blythe Mesa Solar II?
Operational, in the U.S. Energy Information Administration, Form EIA-860M.
Where is Blythe Mesa Solar II?
8.5 km north-west of Blythe, Riverside County, California, United States.

Source: U.S. Energy Information Administration, Form EIA-860M (Preliminary Monthly Electric Generator Inventory). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).