← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Bicker Fen Bess, Vicarage Drove - Battery Storage

Operator FRV TH Powertek Limited

Awaiting Construction400 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Bicker Fen Bess, Vicarage Drove - Battery Storage is a 400 MW battery storage site 13 km south-west of Boston, Lincolnshire, United Kingdom. Its planning application (B/24/0415) went to Boston on 10 October 2024 and was granted on 5 February 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Bicker Fen Bess, Vicarage Drove - Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 65 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells65 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction166 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire179 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
400 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
FRV TH Powertek Limited
Location
Bicker Fen BESS, Land off Vicarage Drove, Bicker Fen, Lincolnshire, PE20 3BN, United Kingdom
Planning authority
Boston
Planning application
B/24/0415

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B/24/0415, with what the planning evidence pack adds for this site.

Every application in Boston · Alerts for applications and incidents near here

  • 10 October 2024 Planning application submitted
  • 5 February 2025 Planning permission granted
  • 5 February 2030 Planning permission runs out

None found. The register holds no published incident that names Bicker Fen Bess, Vicarage Drove - Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Bicker Fen Bess, Vicarage Drove - Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Bicker Fen Bess, Vicarage Drove - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Bicker Fen Bess, Vicarage Drove - Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Bicker Fen Bess, Vicarage Drove - Battery Storage?
13 km south-west of Boston, Lincolnshire, United Kingdom (postcode PE20 3BN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).