Battery storage · United Kingdom

Hammond Bicker Fen - Battery Energy Storage System

Operator Bicker Drove Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 1 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Hammond Bicker Fen - Battery Energy Storage System is a battery storage site 13 km west of Boston, Lincolnshire, United Kingdom. Its planning application (B/25/0224) went to Boston on 28 May 2025 and was granted on 29 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 11 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hammond Bicker Fen - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 64 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells64 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction167 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire180 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Bicker Drove Limited
Location
E/O Bicker Fen Substation, Bicker Fen, Boston, Lincolnshire, PE20 3BQ, United Kingdom
Planning authority
Boston
Planning application
B/25/0224

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for B/25/0224, with what the planning evidence pack adds for this site.

Every application in Boston · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 28 May 2025 Planning application submitted
  • 29 June 2026 Planning permission granted

None found. The register holds no published incident that names Hammond Bicker Fen - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Hammond Bicker Fen - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hammond Bicker Fen - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hammond Bicker Fen - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Hammond Bicker Fen - Battery Energy Storage System?
13 km west of Boston, Lincolnshire, United Kingdom (postcode PE20 3BQ).