← Back to Lincolnshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Willingham By Stow Farm, Marton Road - Battery Energy Storage System

Operator FRV TH Powertek Limited · Owner Frv Powertek Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 10 September 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Willingham By Stow Farm, Marton Road - Battery Energy Storage System is a battery storage site 6.4 km south-east of Gainsborough, Lincolnshire, United Kingdom. Its planning application (WL/2024/00662) went to West Lindsey on 29 August 2024 and was granted on appeal on 19 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 13 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

FRV POWERTEK LIMITED (14161993), active, since 2022. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Willingham By Stow Farm, Marton Road - Battery Energy Storage System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 37 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells37 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool147 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire199 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
FRV TH Powertek Limited
Owner
Frv Powertek Limited
Location
Willingham-By-Stow Farm, Marton Road, Stow, Gainsborough, Lincolnshire, DN21 5BH, United Kingdom
Planning authority
West Lindsey
Planning application
WL/2024/00662

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WL/2024/00662, with what the planning evidence pack adds for this site.

Every application in West Lindsey · Alerts for applications and incidents near here

  • 29 August 2024 Planning application submitted
  • 7 February 2025 Planning permission refused
  • 19 August 2025 Planning permission granted
  • 19 August 2025 Appeal granted
  • 19 August 2030 Planning permission runs out

None found. The register holds no published incident that names Willingham By Stow Farm, Marton Road - Battery Energy Storage System. If you know of one, report it (confidential reports are anonymised).

Has Willingham By Stow Farm, Marton Road - Battery Energy Storage System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Willingham By Stow Farm, Marton Road - Battery Energy Storage System; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Willingham By Stow Farm, Marton Road - Battery Energy Storage System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 September 2025.
Where is Willingham By Stow Farm, Marton Road - Battery Energy Storage System?
6.4 km south-east of Gainsborough, Lincolnshire, United Kingdom (postcode DN21 5BH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).