Onshore wind · United Kingdom
Bessy Bell 2 Extension
Operator Scottish and Southern Energy (SSE)
Planning Permission Expired9 MWData checked 16 November 2026Source record dated 4 June 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bessy Bell 2 Extension is a 9 MW wind farm 10 km north-west of Omagh, Co. Tyrone, United Kingdom. Its planning application (K/2013/0145/F) went to Fermanagh and Omagh on 15 April 2013 and was granted on appeal on 18 January 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 20 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Bessy Bell 2 Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- Scottish and Southern Energy (SSE)
- Location
- Drumlegagh Roadd crossing, South of Baronscourt Road junction, Omagh, Co. Tyrone, BT78 5R, United Kingdom
- Planning authority
- Fermanagh and Omagh
- Planning application
- K/2013/0145/F
- Appeal reference
- 2013/A0219
- Turbines
- 4, 115 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for K/2013/0145/F, with what the planning evidence pack adds for this site.
Every application in Fermanagh and Omagh · Alerts for applications and incidents near here
Timeline
- 15 April 2013 Planning application submitted
- 6 October 2014 Appeal lodged
- 18 January 2016 Planning permission granted
- 18 January 2016 Appeal granted
Incidents on the register at this site
None found. The register holds no published incident that names Bessy Bell 2 Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bessy Bell 2 Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bessy Bell 2 Extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Bessy Bell 2 Extension?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 4 June 2020.
- Where is Bessy Bell 2 Extension?
- 10 km north-west of Omagh, Co. Tyrone, United Kingdom (postcode BT78 5R).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).