← Back to Co. Tyrone
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Lislafferty Road Wind Turbine

Operator Moore Energy

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 13 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lislafferty Road Wind Turbine is a 0.3 MW wind farm 12 km south of Strabane, Co. Tyrone, United Kingdom. Its planning application (LA11/2021/0247/F) went to Derry City and Strabane on 18 February 2021 and was granted on 31 August 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lislafferty Road Wind Turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0422, Wind turbine fire prompts fire service response in Fermanagh, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh33 kmMinor
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm34 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire175 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Moore Energy
Location
Approximately 400m south west of 20 Lislafferty Road Newtownstewart, Co. Tyrone, BT78 4NB, United Kingdom
Planning authority
Derry City and Strabane
Planning application
LA11/2021/0247/F
Turbines
1, 92 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA11/2021/0247/F, with what the planning evidence pack adds for this site.

Every application in Derry City and Strabane · Alerts for applications and incidents near here

  • 18 February 2021 Planning application submitted
  • 31 August 2021 Planning permission granted
  • 20 August 2026 Planning permission expired

None found. The register holds no published incident that names Lislafferty Road Wind Turbine. If you know of one, report it (confidential reports are anonymised).

Has Lislafferty Road Wind Turbine had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lislafferty Road Wind Turbine; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Lislafferty Road Wind Turbine?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 December 2021.
Where is Lislafferty Road Wind Turbine?
12 km south of Strabane, Co. Tyrone, United Kingdom (postcode BT78 4NB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).