Onshore wind · United Kingdom
Beinn Tharsuinn Extension (Beinn nan Oighrean)
Operator Midefearn Renewables
Operational4.6 MWData checked 16 November 2026Source record dated 4 April 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Beinn Tharsuinn Extension (Beinn nan Oighrean) is a 4.6 MW wind farm 10 km north of Alness, Highland, United Kingdom. Its planning application (07/00026/FULSU) went to Highland on 19 January 2007 and was granted on 11 December 2008. It has been operating since 1 July 2009. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 9 other energy sites within 10 km, 4 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Beinn Tharsuinn Extension (Beinn nan Oighrean) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 4.6 MW (this record)
- All phases
- 34.4 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Midefearn Renewables
- Location
- Beinn Tharsuinn Wind Farm, Edderton, Highland., Highland, United Kingdom
- Planning authority
- Highland
- Planning application
- 07/00026/FULSU
- First operating
- 2009
- Turbines
- 2
This record is 4.6 MW, one part of a site built in phases. With Beinn Tharsuinn Windfarm Project (29.8 MW) the phases on the register add up to 34.4 MW. Beinn Tharsuinn Windfarm Project
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 07/00026/FULSU, with what the planning evidence pack adds for this site.
Every application in Highland · Alerts for applications and incidents near here
Timeline
- 19 January 2007 Planning application submitted
- 11 December 2008 Planning permission granted
- 1 July 2009 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Beinn Tharsuinn Extension (Beinn nan Oighrean). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Beinn Tharsuinn Extension (Beinn nan Oighrean) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Beinn Tharsuinn Extension (Beinn nan Oighrean); it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Beinn Tharsuinn Extension (Beinn nan Oighrean)?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2018.
- Where is Beinn Tharsuinn Extension (Beinn nan Oighrean)?
- 10 km north of Alness, Highland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).