Solar · United Kingdom
Bedborough Farm
Operator Solstice Renewables Ltd
Operational7 MWData checked 16 November 2026Source record dated 4 March 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Bedborough Farm is a 7 MW solar farm on the edge of Ferndown, Dorset, United Kingdom. Its planning application (3/14/0790/FUL) went to Dorset on 14 August 2014 and was granted on 3 November 2014. It has been operating since 26 February 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 35 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Bedborough Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Solstice Renewables Ltd
- Location
- Bedborough Farm, Land At Uddens Drive Wimborne Dorset, Dorset, BH21 7BQ, United Kingdom
- Planning authority
- Dorset
- Planning application
- 3/14/0790/FUL
- First operating
- 2016
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 3/14/0790/FUL, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 14 August 2014 Planning application submitted
- 3 November 2014 Planning permission granted
- 15 July 2015 Construction started
- 26 February 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Bedborough Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Bedborough Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Bedborough Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Bedborough Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 March 2016.
- Where is Bedborough Farm?
- On the edge of Ferndown, Dorset, United Kingdom (postcode BH21 7BQ).