Planning pack for this site, £295Other options

Battery storage · United Kingdom

Emmers Farm Battery Storage (Mannington Battery Energy Storage System)

Operator EDF Energy Renewables · Owner Mannington Energy Centre Limited

Under Construction49.9 MWData checked 16 November 2026Source record dated 26 March 2021

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Emmers Farm Battery Storage (Mannington Battery Energy Storage System) is a 49.9 MW battery storage site 3.8 km south-west of Verwood, Dorset, United Kingdom. Its planning application (3/21/0137/FUL) went to Dorset on 22 January 2021 and was granted on 2 July 2021. Construction started on 1 April 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 36 other energy sites within 10 km, 5 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

EDF ENERGY RENEWABLES LIMITED (06456689), active, since 2007. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Emmers Farm Battery Storage (Mannington Battery Energy Storage System) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 96 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire96 kmSignificant
EIR-02492026Smoke and fire incident at Battery Box, Pinhoe Road, Exeter111 kmSignificant
EIR-01092025Fire in single battery unit at Thurrock BESS under construction176 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
EDF Energy Renewables
Owner
Mannington Energy Centre Limited
Location
Land off Holt Road, Dorset, BH21, United Kingdom
Planning authority
Dorset
Planning application
3/21/0137/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 3/21/0137/FUL, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 22 January 2021 Planning application submitted
  • 2 July 2021 Planning permission granted
  • 1 April 2025 Construction started

None found. The register holds no published incident that names Emmers Farm Battery Storage (Mannington Battery Energy Storage System). If you know of one, report it (confidential reports are anonymised).

Has Emmers Farm Battery Storage (Mannington Battery Energy Storage System) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Emmers Farm Battery Storage (Mannington Battery Energy Storage System); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Emmers Farm Battery Storage (Mannington Battery Energy Storage System)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 March 2021.
Where is Emmers Farm Battery Storage (Mannington Battery Energy Storage System)?
3.8 km south-west of Verwood, Dorset, United Kingdom (postcode BH21).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).