← Back to Ayrshire

Onshore wind · United Kingdom

Arecleoch Windfarm

Operator Scottish Power Renewables

Operational120 MWData checked 16 November 2026Source record dated 25 October 2011

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Arecleoch Windfarm is a 120 MW wind farm 20 km south of Girvan, Ayrshire, United Kingdom. Its planning application went to Scottish Government (S36) on 3 April 2006 and was granted on 1 June 2008. It has been operating since 14 June 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 57 other sites and 116 energy sites within 40 km for Arecleoch Windfarm

Members see the sites and incidents around this one, and every record behind them.

3 planned or unplanned unavailability notices published under REMIT, 10 Dec 2026 to 1 Jan 2030, 1 live now. Members see each notice: planned or unplanned, the capacity out, the dates and the cause given.

Contains BMRS data © Elexon Limited copyright and database right. Read each morning; a notice can be withdrawn or revised by the operator.

12 Oct28 Oct
Balancing mechanismWholesale

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

28 settled days to 4 Nov: 84 MWh, running 4% of half hours, peak 5 MW of 120, load factor 0%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £14,938 at its earnings over the last 28 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
120 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Power Renewables
Location
Arecleoch and Kilgallioch Forest near Barrhill, Ayrshire, United Kingdom
Planning authority
Scottish Government (S36)
First operating
2011
Turbines
60

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 3 April 2006 Planning application submitted
  • 1 June 2008 Planning permission granted
  • 1 September 2009 Construction started
  • 14 June 2011 Operational

None found. The register holds no published incident that names Arecleoch Windfarm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Arecleoch Windfarm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arecleoch Windfarm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Arecleoch Windfarm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 October 2011.
Where is Arecleoch Windfarm?
20 km south of Girvan, Ayrshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).