← Back to Ayrshire
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Arecleoch Wind Farm (extension)

Operator ScottishPower Renewables · Owner Scottishpower Renewable Energy Limited

Under Construction20 MWData checked 16 November 2026Source record dated 25 July 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Arecleoch Wind Farm (extension) is a 20 MW battery storage site 20 km south of Girvan, Ayrshire, United Kingdom. Its planning application (ECU00001864) went to Scottish Government (S36) on 12 June 2019 and was granted on 16 November 2021. Construction started on 1 June 2025. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 15 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Arecleoch Wind Farm (extension) sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 223 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool223 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells323 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire419 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
ScottishPower Renewables
Owner
Scottishpower Renewable Energy Limited
Location
Land 2km south west of Barrhill, South Ayrshire, Ayrshire, KA26 0PP, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00001864

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00001864, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 12 June 2019 Planning application submitted
  • 16 November 2021 Planning permission granted
  • 1 June 2025 Construction started

None found. The register holds no published incident that names Arecleoch Wind Farm (extension). If you know of one, report it (confidential reports are anonymised).

Has Arecleoch Wind Farm (extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Arecleoch Wind Farm (extension); it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Arecleoch Wind Farm (extension)?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 July 2025.
Where is Arecleoch Wind Farm (extension)?
20 km south of Girvan, Ayrshire, United Kingdom (postcode KA26 0PP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).