Solar · United Kingdom

Alleston Solar Farm

Operator Stantec UK Limited

Awaiting Construction30 MWData checked 16 November 2026Source record dated 7 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Alleston Solar Farm is a 30 MW solar farm in Pembroke, United Kingdom. Its planning application (CAS-03072-D7X6N7) went to Welsh Government (NSIP) on 16 December 2024 and was granted on 10 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Alleston Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 130 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop130 kmSignificant
EIR-15412015Transformer unit fire at a solar farm on Copshorn Road, Bodmin134 kmMinor
EIR-15442014Fire at solar panel installation near Bodmin Jail134 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
30 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Stantec UK Limited
Location
Alleston Farm, Lamphey Road, Pembrokeshire, SA71 5NJ, United Kingdom
Planning authority
Welsh Government (NSIP)
Planning application
CAS-03072-D7X6N7

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CAS-03072-D7X6N7, with what the planning evidence pack adds for this site.

Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here

  • 16 December 2024 Planning application submitted
  • 10 March 2026 Planning permission granted
  • 10 March 2031 Planning permission runs out

None found. The register holds no published incident that names Alleston Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Alleston Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Alleston Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Alleston Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 May 2026.
Where is Alleston Solar Farm?
In Pembroke, United Kingdom (postcode SA71 5NJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).