Solar · United Kingdom
Alleston Solar Farm
Operator Stantec UK Limited
Awaiting Construction30 MWData checked 16 November 2026Source record dated 7 May 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Alleston Solar Farm is a 30 MW solar farm in Pembroke, United Kingdom. Its planning application (CAS-03072-D7X6N7) went to Welsh Government (NSIP) on 16 December 2024 and was granted on 10 March 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Alleston Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Alleston Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 130 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1533 | 2022 | Solar panel fault causes fire at village hall roof in Cheriton Bishop | 130 km | Significant |
| EIR-1541 | 2015 | Transformer unit fire at a solar farm on Copshorn Road, Bodmin | 134 km | Minor |
| EIR-1544 | 2014 | Fire at solar panel installation near Bodmin Jail | 134 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Stantec UK Limited
- Location
- Alleston Farm, Lamphey Road, Pembrokeshire, SA71 5NJ, United Kingdom
- Planning authority
- Welsh Government (NSIP)
- Planning application
- CAS-03072-D7X6N7
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CAS-03072-D7X6N7, with what the planning evidence pack adds for this site.
Every application in Welsh Government (NSIP) · Alerts for applications and incidents near here
Timeline
- 16 December 2024 Planning application submitted
- 10 March 2026 Planning permission granted
- 10 March 2031 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Alleston Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Alleston Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Alleston Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Alleston Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 7 May 2026.
- Where is Alleston Solar Farm?
- In Pembroke, United Kingdom (postcode SA71 5NJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).