Onshore wind · United Kingdom
Aire & Calder Wind Farm
Operator E.ON UK
Application Withdrawn45 MWData checked 16 November 2026Source record dated 29 June 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Aire & Calder Wind Farm is a 45 MW wind farm 7.8 km north of Stainforth, Humberside, United Kingdom. Its planning application (05/05933/STPLFE) went to East Riding of Yorkshire on 1 August 2005 and was withdrawn on 25 November 2010. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 46 other energy sites within 10 km, 5 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Aire & Calder Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
E.ON UK LIMITED (02366970), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 45 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- E.ON UK
- Location
- Nr Sneid, land south of M62, north of Aire & Calder navigation, nr Pollington, Humberside, United Kingdom
- Planning authority
- East Riding of Yorkshire
- Planning application
- 05/05933/STPLFE
- Turbines
- 15
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 05/05933/STPLFE, with what the planning evidence pack adds for this site.
Every application in East Riding of Yorkshire · Alerts for applications and incidents near here
Timeline
- 1 August 2005 Planning application submitted
- 25 November 2010 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Aire & Calder Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Aire & Calder Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Aire & Calder Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Aire & Calder Wind Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 29 June 2011.
- Where is Aire & Calder Wind Farm?
- 7.8 km north of Stainforth, Humberside, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).