Battery storage · United Kingdom

Helios Renewable Energy Project

Operator Enso Green Holdings D Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 16 December 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Helios Renewable Energy Project is a battery storage site 7.8 km south of Selby, North Yorkshire, United Kingdom. Its planning application (EN010140) went to The Planning Inspectorate - National Infrastructure on 2 July 2024 and was granted on 3 December 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 58 other energy sites within 10 km, 32 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Helios Renewable Energy Project sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 66 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells66 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool127 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire230 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Enso Green Holdings D Limited
Location
Sw/O Camblesforth & N/O Hirst Courtney, Selby, North Yorkshire, YO8 8QT, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010140

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010140, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 2 July 2024 Planning application submitted
  • 3 December 2025 Planning permission granted

None found. The register holds no published incident that names Helios Renewable Energy Project. If you know of one, report it (confidential reports are anonymised).

Has Helios Renewable Energy Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Helios Renewable Energy Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Helios Renewable Energy Project?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 December 2025.
Where is Helios Renewable Energy Project?
7.8 km south of Selby, North Yorkshire, United Kingdom (postcode YO8 8QT).