Planning pack for this site, £295Other options

Solar · United Kingdom

Advanced alloy services, Nobel Way - Solar Panels

Operator Advanced Alloy services

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 19 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Advanced alloy services, Nobel Way - Solar Panels is a 0.3 MW solar farm on the edge of Dinnington, South Yorkshire, United Kingdom. Its planning application (RB2026/0267) went to Rotherham on 25 February 2026 and was granted on 1 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 47 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Advanced alloy services, Nobel Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster19 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof55 kmMinor
EIR-12652024Solar panels catch fire and destroy three buildings in Harby60 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Advanced Alloy services
Location
Advanced Alloy Services, Nobel Way, Dinnington, Sheffield, South Yorkshire, S25 3QH, United Kingdom
Planning authority
Rotherham
Planning application
RB2026/0267

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RB2026/0267, with what the planning evidence pack adds for this site.

Every application in Rotherham · Alerts for applications and incidents near here

  • 25 February 2026 Planning application submitted
  • 1 April 2026 Planning permission granted

None found. The register holds no published incident that names Advanced alloy services, Nobel Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Advanced alloy services, Nobel Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Advanced alloy services, Nobel Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Advanced alloy services, Nobel Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2026.
Where is Advanced alloy services, Nobel Way - Solar Panels?
On the edge of Dinnington, South Yorkshire, United Kingdom (postcode S25 3QH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).