Onshore wind · United Kingdom

Aberarder Wind Farm

Operator Scottish & Southern Energy · Owner Aberarder Wind Farm LLP

Under Construction49.9 MWData checked 16 November 2026Source record dated 17 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Aberarder Wind Farm is a 49.9 MW wind farm 25 km south of Westhill, Highland, United Kingdom. Its planning application (15/00737/FUL) went to Highland on 3 March 2015 and was granted on appeal on 7 April 2017. Construction started on 1 March 2023. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 2 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Aberarder Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0767, Nordex turbine fire prompts investigation at Scottish wind farm, 53 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07672024Nordex turbine fire prompts investigation at Scottish wind farm53 kmSignificant
EIR-00632024Fatal fall from turbine nacelle during onshore wind maintenance, UK53 kmMajor
EIR-00322017Fatal fall during onshore wind turbine construction, inquiry findings on rescue arrangements and equipment53 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Scottish & Southern Energy
Owner
Aberarder Wind Farm LLP
Location
Land 4.5km South East Of Aberarder House Aberarder Inverness, Highland, IV2 6UE, United Kingdom
Planning authority
Highland
Planning application
15/00737/FUL
Appeal reference
PPA-270-2158
Turbines
12, 130 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00737/FUL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 3 March 2015 Planning application submitted
  • 19 April 2016 Planning permission refused
  • 14 July 2016 Appeal lodged
  • 7 April 2017 Planning permission granted
  • 7 April 2017 Appeal granted
  • 1 March 2023 Construction started

None found. The register holds no published incident that names Aberarder Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Aberarder Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Aberarder Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Aberarder Wind Farm?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 August 2023.
Where is Aberarder Wind Farm?
25 km south of Westhill, Highland, United Kingdom (postcode IV2 6UE).