A fire at the Waltloo substation in Tshwane, South Africa, on 29 September left residents in Murrayfield, parts of Silverton, Meyerspark, East Lynne and surrounding areas without power for more than 12 days. A local ward councillor said the outage was a...
Tshwane
Named in a role in 1 record, and mentioned in the text of 31 entries, in 2026.
Being named is not a finding of fault. Counts are of records in published reporting, not rates, and the company's role is the one the sources give.
Work at Tshwane? See every record that names it, free, and ask for a correction or add your side.
Records naming this company
Free entries that mention Tshwane
An explosion occurred at the Watloo Substation, causing the 132kV Njala Infeed Substation to trip and leading to a major power supply interruption across several parts of Tshwane. Multiple primary substations were affected, including Watloo, Wingate,...
On the night of Thursday 12 February 2026, Transformer C at the Heatherley Substation in eastern Pretoria burned, and residents reported hearing an explosion. Power went off shortly after 22:00. The City of Tshwane confirmed that the transformer had burned...
See what failed, why, and what it cost
The record behind each entry: the manufacturer, integrator and operator, root cause, failure mode, downtime, losses and every source.
A substation fire in Tshwane, South Africa, damaged cables in the East Lynne and Jan Niemand Park areas, according to a Central News South Africa report published on 7 January 2026. The headline states that Tshwane has hired a private contractor to fast-track...
In the early hours of Thursday, 25 December 2025, a fire broke out at the Olivenhoutbosch substation operated by the City of Tshwane. The blaze was attributed to cable theft, which damaged critical electrical equipment including cabling and switchgear. One...
On 20 May 2025, at around 05:50, Transformer 1A at the Zwartkop Substation in the Tshwane metro exploded, causing a power outage across multiple areas. The source reports fire damage to the Lyttelton/Kwagga Overhead Line 1 and does not say whether the...
A fire broke out at the Waltloo Substation in Tshwane early on 24 April 2025. The City of Tshwane said the Waltloo Transformer 1B caught fire just after midnight, and that this led to power trips in the supply areas of the Rooiwal, Pyramid, Phumulani, Waltloo...
On 3 April 2025 a fire broke out at the Brakfontein Substation in Centurion, part of the City of Tshwane's electricity network, causing extensive damage and, according to reporting, an explosion that knocked out power to multiple suburbs including...
The City of Tshwane said that on 18 February 2025 a voltage transformer exploded at the Njala Substation in Pretoria, and that a fire followed. The city reported a 132kV outage affecting multiple substations and areas, mostly in the east of Pretoria, and said...
On Wednesday 2 October 2024, a fire at the Pyramid substation in Rooiwal, north of Tshwane, South Africa, left parts of the area without electricity, according to Jacaranda FM. The report says a 132kV line tripped and panels caught fire. Areas fed from the...
A fire broke out at Kwagga substation in Tshwane on 10 October 2024. Reports said supply was lost in Pretoria City Centre, Pretoria West, Atteridgeville, Pretoria North and Soshanguve, and the City of Tshwane said all southern parts of Tshwane were affected....
On 17 August 2024, volunteer responders reported an explosion at Nyala Substation on Delmas Road in Pretoria East. They found a burning transformer, set up a safety area, and called City of Tshwane firefighters. Crews then set up an inline foam system and...
On 10 April 2024, a fire broke out at the Raslouw substation in Tshwane, South Africa, at about 11:50. Tshwane Emergency Services said the fire was promptly extinguished. A breaker inside the substation caught fire, and the substation had to be disconnected....
Parts of Sinoville, Tshwane, South Africa, were left without power from Monday night, 26 February 2024, after a substation caught fire. According to the City of Tshwane, panel 12 in the substation blew up when power was restored following scheduled...
A fire broke out at the K3 substation in Rosslyn, belonging to the City of Tshwane, following an attempted theft of an 11kv cable. The blaze caused severe damage to the substation’s switchgear panels. This led to a disruption in power supply to several...
A transformer exploded at an electrical substation in Lynnwood, Pretoria, South Africa, and a fire followed. The City of Tshwane’s electricity department was probing the extent of the damage. Tshwane Emergency Services doused the blaze on Saturday night. The...
An explosion at the Mooikloof substation in Pretoria on a Wednesday night was reported to have been due to a fault on one of the 11 kV power lines outside the substation operated by City of Tshwane. The subsequent fire damaged Transformer B and the 11 kV...
A fire gutted the Pyramid substation in the early hours, leaving parts of Rooiwal, north of Pretoria, without power and water. The City of Tshwane said the incident tripped the 132 kV Line 1 Bellom-Parktown and caused outages at Pretoria North, Wonderboom,...
A fire broke out at Pretoria East Hospital in Tshwane, South Africa, after solar panels located above some of the hospital's theatres caught alight. The blaze started on Thursday evening and was extinguished around midnight. Parts of the hospital were...
In the early hours of a Wednesday morning, a fire broke out at the temporary Pyramid substation in Pretoria, South Africa. The asset is owned and operated by City of Tshwane. A City of Tshwane utilities official said the fire followed lightning during...
What this page is, and what it is not
It counts the records in this register that name this company in any role. Being named is not a finding of fault. Most incidents have several contributing causes, and the company named as manufacturer, integrator, operator or contractor is often not the cause of what went wrong.
Counts reflect what public reporting names, so a company with a large installed base, or one operating where reporting is open, will appear more often than a company of the same size elsewhere. Read the counts alongside the note on coverage in the methodology.
If you work for this company and something here is wrong, tell us and we will correct it. Use the corrections page: we acknowledge within 2 working days and decide within 10.