Planning application · Solar · Breckland

Woodlands Farm - Solar Array

Awaiting Construction49.9 MWApplication DC/22/01530Submitted 23 March 2022Granted on appeal 7 January 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DC/22/01530
Planning authority
Breckland
County or area
Suffolk
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Elgin Energy EsCo Limited
Location
Woodlands Farm Stowmarket Road Badley, IP24 2AH
Appeal reference
AP/24/00058
  • 23 March 2022 Planning application submitted
  • 8 December 2023 Planning permission refused
  • 24 May 2024 Appeal lodged
  • 7 January 2025 Planning permission granted
  • 7 January 2025 Appeal granted
  • 7 January 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 48 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium48 kmMinor
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire69 kmMajor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof70 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near IP24 2AH is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Breckland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.