← Back to Norfolk
Planning pack for this site, £295Other options

Solar · United Kingdom

Charrold Works, Stephenson Way - Solar Panels

Operator Pegasus Profiles Limited

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 21 July 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Charrold Works, Stephenson Way - Solar Panels is a 0.5 MW solar farm on the edge of Thetford, Norfolk, United Kingdom. Its planning application (PL/2026/0711/PAPV) went to Breckland on 18 May 2026 and was granted on 23 June 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 16 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Charrold Works, Stephenson Way - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 47 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium47 kmMinor
EIR-28152026Solar panel on school roof starts primary school fire in Ipswich48 kmSignificant
EIR-27312021Electrical fault in solar panel control unit sparks loft fire in Ipswich48 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Pegasus Profiles Limited
Location
Pegasus Profiles Ltd, CHARROLD WORKS Stephenson Way, Thetford, Norfolk, IP24 3RJ, United Kingdom
Planning authority
Breckland
Planning application
PL/2026/0711/PAPV

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2026/0711/PAPV, with what the planning evidence pack adds for this site.

Every application in Breckland · Alerts for applications and incidents near here

Status changed from Application Submitted to Awaiting Construction on 16 November 2026.

  • 18 May 2026 Planning application submitted
  • 23 June 2026 Planning permission granted

None found. The register holds no published incident that names Charrold Works, Stephenson Way - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Charrold Works, Stephenson Way - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Charrold Works, Stephenson Way - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Charrold Works, Stephenson Way - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Charrold Works, Stephenson Way - Solar Panels?
On the edge of Thetford, Norfolk, United Kingdom (postcode IP24 3RJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).