← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Herefordshire, County of

Witches Solar Farm

Operational5 MWApplication S103018/FSubmitted 29 November 2010Granted 8 February 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
S103018/F
Planning authority
Herefordshire, County of
County or area
Hereford and Worcester
Nation
England
Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Smarter Energy Solutions
Location
Prothither Farm, Hoarwithy, Herefordshire, HR2 6QJ
First operating
2013
  • 29 November 2010 Planning application submitted
  • 8 February 2011 Planning permission granted
  • 19 February 2013 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1551, Fire involving solar panels on a garage roof in Shropshire, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15512019Fire involving solar panels on a garage roof in Shropshire44 kmMinor
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries56 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire59 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near HR2 6QJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Herefordshire, County of.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.