West Farm, Cosheston - Solar Farm

Under Construction9 MWApplication 23/0701/PASubmitted 12 December 2023Granted 28 March 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/0701/PA
Planning authority
Pembrokeshire
County or area
Dyfed
Nation
Wales
Technology
Solar
Capacity
9 MW
Status
Under Construction
Operator or applicant
One Planet Developments Limited
Location
West Farm, Cosheston, SA72 4UN
  • 12 December 2023 Planning application submitted
  • 28 March 2024 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1533, Solar panel fault causes fire at village hall roof in Cheriton Bishop, 133 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop133 kmSignificant
EIR-15412015Transformer unit fire at a solar farm on Copshorn Road, Bodmin137 kmMinor
EIR-15442014Fire at solar panel installation near Bodmin Jail137 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SA72 4UN is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Pembrokeshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.