← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Cumberland

Threapland Lees

Application Withdrawn12 MWApplication 2/2009/0788Submitted 30 October 2009Withdrawn 7 September 2010

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2/2009/0788
Planning authority
Cumberland
County or area
Cumbria
Nation
England
Technology
Onshore wind
Capacity
12 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
BT
Location
Bothel, Cumbria
Turbines
4
  • 30 October 2009 Planning application submitted
  • 7 September 2010 Application withdrawn

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1134, Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire, 103 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire103 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm104 kmMajor
EIR-16242026Crane topples on Scout Moor wind farm project109 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Threapland Lees is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cumberland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.