The Swinton Estate, Swinton Road - Solar Panels

Awaiting Construction0.4 MWApplication 25/01962/FULSubmitted 2 July 2025Granted 11 November 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
25/01962/FUL
Planning authority
North Yorkshire
Nation
England
Technology
Solar
Capacity
0.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
The Swinton Estate
Location
The East Of The Swinton Estate, Located To The East Of Swinton Road And South Of Masham Golf Course., HG4 4NS
  • 2 July 2025 Planning application submitted
  • 11 November 2025 Planning permission granted
  • 11 November 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 45 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre45 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton57 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster93 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near HG4 4NS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Yorkshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.