← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Nuneaton and Bedworth

St Georges Way - Solar photovoltaics

Awaiting Construction0.6 MWApplication 38737Submitted 14 March 2022Granted 6 May 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
38737
Planning authority
Nuneaton and Bedworth
County or area
Warwickshire
Nation
England
Technology
Solar
Capacity
0.6 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Goodman
Location
1 St Georges Way, Nuneaton, CV10 7JS
  • 14 March 2022 Planning application submitted
  • 6 May 2022 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1272, Fire in solar panel distribution board at Birmingham college, 26 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12722022Fire in solar panel distribution board at Birmingham college26 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge32 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property36 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CV10 7JS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Nuneaton and Bedworth.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.