← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Flintshire

Shotwick Solar Farm

Operational72.2 MWApplication 51772Submitted 21 February 2014Granted 1 June 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
51772
Planning authority
Flintshire
Nation
Wales
Technology
Solar
Capacity
72.2 MW
Status
Operational
Operator or applicant
Foresight Solar Fund
Location
Weighbridge Road, Sealand, Deeside, Clwyd, CH5 2NN
First operating
2016
  • 21 February 2014 Planning application submitted
  • 1 June 2015 Planning permission granted
  • 15 November 2015 Construction started
  • 31 March 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school44 kmSignificant
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire51 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent60 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CH5 2NN is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Flintshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.