← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Vale of White Horse

Rutherford Appleton Laboratory, Building R105 & R106, Harwell - Solar Panel

Application Withdrawn0.6 MWApplication P22/V0819/N8ASubmitted 30 March 2022Withdrawn 19 May 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
P22/V0819/N8A
Planning authority
Vale of White Horse
County or area
Oxfordshire
Nation
England
Technology
Solar
Capacity
0.6 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Science and Technology Facilities Council
Location
Building R105 & R106 Rutherford Appleton Laboratory Harwell, OX11 0FA
  • 30 March 2022 Planning application submitted
  • 19 May 2022 Application withdrawn

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 38 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing38 kmMinor
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End42 kmMinor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire45 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near OX11 0FA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Vale of White Horse.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.