← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Battery storage · Shropshire

Rock Farm - Solar Farm

Under Construction12 MWApplication 22/05424/EIASubmitted 2 December 2022Granted 25 September 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/05424/EIA
Planning authority
Shropshire
Nation
England
Technology
Battery storage (Co-located with RE)
Capacity
12 MW
Status
Under Construction
Operator or applicant
Enviromena
Location
SE Of Rock Farm Rocks Green Ludlow, SY8 2DS
  • 2 December 2022 Planning application submitted
  • 25 September 2023 Planning permission granted
  • 1 January 2026 Construction started
  • 25 September 2026 Planning permission expired

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0058, Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire, 91 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire91 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool114 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth, caused by a short circuit in NMC cells135 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SY8 2DS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Shropshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.