← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Northumberland

Ray Wind Farm

Operational54.4 MWApplication 06/00023/CPCSubmitted 12 December 2005Granted 11 November 2010

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
06/00023/CPC
Planning authority
Northumberland
Nation
England
Technology
Onshore wind
Capacity
54.4 MW
Status
Operational
Operator or applicant
Vattenfall
Location
Kirkwhelpington, Newcastle-upon-Tyne, Tyne and Wear, NE19 2
Turbines
16
First operating
2017
  • 12 December 2005 Planning application submitted
  • 11 November 2010 Planning permission granted
  • 1 July 2015 Construction started
  • 5 February 2017 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1119, Wind turbine fire at Butterwick Wind Farm near Sedgefield, 71 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11192019Wind turbine fire at Butterwick Wind Farm near Sedgefield71 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate137 kmSignificant
EIR-10252018Worker dies after becoming stranded at Afton wind farm142 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NE19 2 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Northumberland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.