← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Barnsley

Premier Foods Bakery, Fish Dam Lane - Solar Farm

Operational2 MWApplication 2023/0845Submitted 11 September 2023Granted 8 April 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2023/0845
Planning authority
Barnsley
County or area
South Yorkshire
Nation
England
Technology
Solar
Capacity
2 MW
Status
Operational
Operator or applicant
Premier Foods Plc
Location
Premier Foods Bakery, Fish Dam Lane, Carlton, Barnsley, S71 3HF
First operating
2025
  • 11 September 2023 Planning application submitted
  • 8 April 2024 Planning permission granted
  • 1 June 2025 Construction started
  • 1 December 2025 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1552, Fire starts in solar panels on commercial roof in Doncaster, 32 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster32 kmSignificant
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school72 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton74 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near S71 3HF is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Barnsley.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.