← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · North East Lincolnshire

Port Of Immingham West Riverside, Immingham Docks - Wind Turbines

Awaiting Construction4.2 MWApplication DM/0329/24/FULSubmitted 16 April 2024Granted 27 March 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
DM/0329/24/FUL
Planning authority
North East Lincolnshire
County or area
Lincolnshire
Nation
England
Technology
Onshore wind
Capacity
4.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Associated British Ports
Location
Port Of Immingham West Riverside Immingham Docks Immingham, DN40 2LZ
Turbines
1, 149.9 m to tip
  • 16 April 2024 Planning application submitted
  • 27 March 2026 Planning permission granted
  • 27 March 2029 Planning permission expired Date as recorded in the register

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1946, Wind turbine fire sends black smoke across Hull, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19462022Wind turbine fire sends black smoke across Hull18 kmSignificant
EIR-18102022Wind turbine at Cargill Hull factory damaged by fire18 kmMajor
EIR-09232009Wind turbine blade detaches at Conisholme wind farm in Lincolnshire after bolt failure29 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DN40 2LZ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North East Lincolnshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.